Securing The 7100G-Series Switch To The Rack In A Flush Mount Configuration; Securing The 7100G-Series Switch To The Rack In A Mid-Mount Configuration - Enterasys 7100G Series Hardware Installation Manual

Table of Contents

Advertisement

3.
Secure the 7100G-Series switch to each rack post with at least two screws or fasteners
appropriate to the rack as shown in callout 1 of the appropriate figure
Figure
2-8).
Figure 2-7

Securing the 7100G-Series Switch to the Rack in a Flush Mount Configuration

1
4 or 6 screws or fasteners appropriate to the rack
Figure 2-8

Securing the 7100G-Series Switch to the Rack in a Mid-Mount Configuration

1
4 - 6 screws or fasteners appropriate to the rack
Mounting the 7100G-Series Switch
Enterasys 7100G-Series Hardware Installation Guide 2-11
(Figure 2-7
or

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

71g21k2l2-48p71g11k2l2-4871g21k2l2-24p24

Table of Contents