Installing A Power Supply - Enterasys 7100G Series Hardware Installation Manual

Table of Contents

Advertisement

3.
Holding the power supply by the handle and bottom, align the power supply with the left
power supply bay (labeled PS1).
4.
Slide the power supply forward until it is plugged into the chassis connector and the lock tab
clicks to the right. Pull on the power supply handle to ensure that the power supply is firmly
in place. See
Figure
Figure 2-9

Installing a Power Supply

1
Lock Tab
5.
If you are installing a second power supply, remove the coverplate from the right power
supply bay by unscrewing the screw that attaches the coverplate to the 7100G-Series switch
and rotating the coverplate out of its position from right to left before disengaging it from the
chassis (see
Figure 2-10
2-9.
on page 2-14). Reinstall the screw once the cover plate is removed.
Enterasys 7100G-Series Hardware Installation Guide 2-13
Installing the Power Supplies

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

71g21k2l2-48p71g11k2l2-4871g21k2l2-24p24

Table of Contents