D. CHECKING SUPERHEAT AND SUBCOOLING
The subcooling temperature of each system can
be calculated by recording the temperature of the
liquid line at the outlet of the condenser and sub-
tracting it from the liquid line saturation tempera-
ture at the liquid stop valve (liquid line saturation
temp. is converted from a temperature/pressure chart).
Example:
Liquid line pressure =
325 PSIG converted to temp. 101 °F
Minus liquid line temp. -86 °F
Subcooling = 15 °F
The subcooling should be adjusted to 15 °F at design
conditions.
1. Record the liquid line pressure and its corresponding
temperature, liquid line temperature and subcooling
below: ......................................................................
SYS 1
Liq Line Press = ––––––– ––––––– PSIG
Saturated Temp = ––––––– ––––––– °F
Liq Line Temp = ––––––– ––––––– °F
Subcooling = ––––––– ––––––– °F
After the subcooling is verified, the suction super-
heat should be checked. The superheat should be
checked only after steady state operation of the chill-
er has been established, the leaving water tempera-
ture, and the unit is running in a fully loaded condition.
Correct superheat setting for a system is 10°F - 15°F
(5.56°C - 8.33 °C) 18" (46 cm) from the heat exchanger.
Superheat should typically be set for not less than
10°F with only a single compressor running on a
circuit. The superheat is calculated as the difference
between the actual temperature of the returned refriger-
ant gas in the suction line entering the compressor and
the temperature corresponding to the suction pressure
as shown in a standard pressure/temperature chart.
P.O. Box 1592, York, Pennsylvania USA 17405-1592
Copyright © by Johnson Controls 2013
Form 201.26-CL1 (313)
Issue Date: March 28, 2013
Supersedes:201.26-CL1 (409)
JOHNSON CONTROLS
SYS 2
E. LEAK CHECKING
800-861-1001
www.johnsoncontrols.com
SECTION 6 – COMMISSIONING
Example:
Suction Temp =
minus Suction Press
105 PSIG converted to Temp -34 °F
Superheat =
When adjusting the expansion valve (TXV only), the
adjusting screw should be turned not more than one
turn at a time, allowing sufficient time (approximately
15 minutes) between adjustments for the system and
the thermal expansion valve to respond and stabilize.
Assure that superheat is set at a minimum of 10°F (5.56
°C) with a single compressor running on each circuit.
2. Record
the
suction
tion
pressure,
suction
ture,
and
superheat
of
SYS 1
Suction Temp = ––––––– ––––––– PSIG
Suction Pressure = ––––––– ––––––– °F
Saturation Temp = ––––––– ––––––– °F
Superheat = ––––––– ––––––– °F
Leak check compressors, fittings, and piping to en-
sure no leaks. ...............................................................
If the unit is functioning satisfactorily during the ini-
tial operating period, no safeties trip and the compres-
sors cycle to control water temperature to setpoint,
the chiller is ready to be placed into operation.
Subject to change without notice. Printed in USA
46 °F
12 °F
temperature,
suc-
saturation
tempera-
each
system
below:
SYS 2