SECTION 5 – TECHNICAL DATA
INSTALLATION OF 1" DEFLECTION MOUNTS
1. Floor or steel frame should be level and smooth.
2. For pad installations, isolators do not normally
require bolting. If necessary, anchor isolators to
floor through bolt holes in the base plate.
Isolators must be bolted to the substruc-
ture and the equipment must be bolted to
the isolators when outdoor equipment is
exposed to wind forces.
3. Lubricate the threads of adjusting bolt. Loosen the
hold down bolts to allow for isolator adjustment.
4. Block the equipment 10mm (1/4") higher than the
specified free height of the isolator. To use the
isolator as blocking for the equipment, insert a
10mm (1/4") shim between the upper load plate
and vertical uprights. Lower the equipment on the
blocking or shimmed isolators.
5. Complete piping and fill equipment with water,
refrigerant, etc.
104
Units shipped before June 15, 2008
6. Turn leveling bolt of first isolator four full revolu-
7. Continue turning leveling bolts until the equip-
8. Turn the leveling bolt of all mountings in either
9. Tighten the nuts on hold down bolts to permit a
10. Installation is now complete.
tions and proceed to each mount in turn.
ment is fully supported by all mountings and the
equipment is raised free of the spacer blocks or
shims. Remove the blocks or shims.
direction in order to level the installation.
clearance of 2mm (1/8") between resilient washer
and underside of channel cap plate.
FORM 201.26-NM1