Set the ac power switch on the
rear of the tape unit to the
I
(on)
position.
Set the Power switch on the
control panel to the On position
Insert the CE test tape and run
sequence test 2; see "Running
Diagnostic Tests" on page A-5.
Chapter 3. Service Procedures
3-1 13