Step 1: Prepare The Site; Rack-Mounting Requirements; Required Tools - Juniper SRX 3400 Getting Started Manual

Services gateway
Hide thumbs Also See for SRX 3400:
Table of Contents

Advertisement

NOTE: Some combinations of CFMs installed in the device may exceed the power
supply capacity if the device is powered by one or even two DC power supplies. If
the device configuration exceeds the available power, the power management feature
disables one or more of the CFMs to prevent damage to the device or power supplies.
See the SRX 3400 Services Gateway Hardware Guide for information about supported
configurations.
The services gateway is shipped in a cardboard carton. Quick start installation
instructions and an accessory box are also included in the shipping container.

Step 1: Prepare the Site

Rack-Mounting Requirements

CAUTION: When installing the device in a two-post rack, you must install the
mounting brackets in the chassis center holes as shown in Figure 3 on page 6.

Required Tools

To unpack the services gateway and prepare for installation, you need the following
tools:
You can install the device in a four-post rack or cabinet or a two-post rack.
The rack rails must be spaced widely enough to accommodate the external
dimensions of the device chassis: 5.25 in. (13.3 cm) high, 25.5 in. (64.8 cm)
deep, and 17.5 in. (44.5 cm) wide. The outer edges of the mounting brackets
extend the width to 19 in. (48.3 cm).
The rack must be strong enough to support the weight of the fully configured
device, up to 75 lbs (34.1 kg). If you stack five fully configured devices in one
rack, it must be capable of supporting about 375 lb (170 kg).
For service personnel to remove and install hardware components, there must
be adequate space at the front and back of the device. Allow at least
30 in. (76.2 cm) in front of the device and 24 in. (61 cm) behind the device.
The rack or cabinet must have an adequate supply of cooling air.
Ensure that the cabinet allows the chassis hot exhaust air to exit the cabinet
without recirculating into the device.
The device must be installed in a rack that is secured to the building structure.
The device should be mounted at the bottom of the rack if it is the only unit in
the rack.
When mounting the device in a partially filled rack, load the rack from the bottom
to the top with the heaviest component at the bottom of the rack.
A mechanical lift—recommended
Step 1: Prepare the Site
Step 1: Prepare the Site
5

Advertisement

Table of Contents
loading

Table of Contents