Step 1: Prepare The Site; Rack-Mounting Requirements - Juniper SRX 5600 Getting Started Manual

Services gateway
Hide thumbs Also See for SRX 5600:
Table of Contents

Advertisement

SRX 5600 Services Gateway Getting Started Guide

Step 1: Prepare the Site

Figure 1: Rack Clearance and Chassis Dimensions

Rack-Mounting Requirements

4
Step 1: Prepare the Site
You can install the device in a four-post rack or cabinet or an open-frame rack.
The rack rails must be spaced widely enough to accommodate the device chassis's
external dimensions: 14.0 in. (35.6 cm) high, 24.5 in. (62.2 cm) deep, and
17.45 in. (44.3 cm) wide. The outer edges of the mounting brackets extend the
width to 19 in. (48.3 cm).
The rack must be strong enough to support the weight of the fully configured
device, up to 163.5 lb (74.2 kg). If you stack five fully configured devices in one
rack, it must be capable of supporting about 818 lb (371.0 kg).
For service personnel to remove and install hardware components, there must
be adequate space at the front and back of the device. Allow at least
30 in. (76.2 cm) in front of the device and 24 in. (61 cm) behind the device.
The rack or cabinet must have an adequate supply of cooling air.
Ensure that the cabinet allows the chassis hot exhaust air to exit the cabinet
without recirculating into the device.