Preparing For Use After Storage - KTM 1290 Super Duke GT Owner's Manual

Hide thumbs Also See for 1290 Super Duke GT:
Table of Contents

Advertisement

21.2

Preparing for use after storage

Take the motorcycle off the front lifting gear. (
Remove the rear of the motorcycle from the lifting gear.
(
p. 188)
Install 12-V battery.
Info
If the 12-V battery was removed, the time and date
must be set.
401059-01
Perform checks and maintenance measures when preparing for
use. (
p. 157)
Take a test ride.
p. 190)
(
p. 253)
STORAGE 21
305

Advertisement

Table of Contents
loading

Table of Contents