Installing The Detector - Agilent Technologies G1314B VWD User Manual

Variable wavelength detector
Table of Contents

Advertisement

Installing the Detector

Preparations
Parts required
1 Install the LAN interface board in the detector (if required), see
2 Place the detector in the stack or on the bench in a horizontal position.
3 Ensure the line power switch at the front of the detector is OFF.
Status indicator
green/yellow/red
Line power switch
with green light
Figure 7
Front View of Detector
The figure above shows the flow cell already installed. The flow cell area is closed with a
N O T E
metal cover. The flow cell has to be installed as described in
Detector"
1200 Series Variable Wavelength Detector User Manual
Locate bench space.
Provide power connections.
Unpack the detector.
Detector
Power cord, for other cables see text below and
ChemStation and/or Control Module G1323B
the Interface Board"
on page 36.
on page 99.
Installing the Detector
""
on page 118
"Replacing
"Flow Connections to the
3
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1200 seriesG1314c vwd-sl

Table of Contents