Required Tools And Equipment - Cisco PA-MC-2T3+ Installation And Configuration Manual

Multi-channel t3 port adapter
Table of Contents

Advertisement

Preparing for Installation
This chapter describes the general equipment, safety, and site preparation requirements for installing the
Cisco PA-MC-2T3+ port adapter. This chapter contains the following sections:

Required Tools and Equipment

You need the following tools and parts to install a port adapter. If you need additional equipment, contact
a service representative for ordering information.
OL-3526-05
Required Tools and Equipment, page 2-1
Software and Hardware Requirements, page 2-2
Checking Hardware and Software Compatibility, page 2-3
75-Ohm In-Line Coaxial Attenuator, page 2-3
Safety Guidelines, page 2-3
FCC Class A Compliance, page 2-9
PA-MC-2T3+(=) port adapter.
Cisco 7200 VXR routers Port Adapter Jacket Card for installation of a port adapter in the I/O
controller slot (requires an NPE-G1 or NPE-G2
VIP (for installation in Cisco 7000 series or Cisco 7500 series chassis only). Two 75-ohm 734A
coaxial cables (one for transmit and one for receive) per T3 port.
Cisco 7304 PCI Port Adapter Carrier Card (for installation in a Cisco 7304 router).
Number 1 Phillips and a 3/16-inch flat-blade screwdriver (for VIP installation only).
Number 2 Phillips screwdriver.
Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist
strap included with all upgrade kits, field-replaceable units (FRUs), and spares.
Antistatic mat.
Antistatic container.
Attenuator kit (optional).
PA-MC-2T3+ Multi-Channel T3 Port Adapter Installation and Configuration
C H A P T E R
2
2-1

Advertisement

Table of Contents
loading

Table of Contents