installation
HRI3E / LRI3E OPTIONAL BACKING PLATE
OPTIONAL BACKING PLATE INSTALLATION
1. Shut off unit and allow to return to room temperature
2. Attach the backing plate with 4 screws from the back of the Vignette frame.
Install backing plate to inner Vignette frame with 4 screws
3. Install the backing plate + inner Vignette frame and outer Vignette
frame as per Arched Vignette frame instructions.
Completed Arch Vignette Faceplate with spacer
and backing plate installed
48
|
LRI4E / HRI4E-11 Direct Vent Gas Insert