Mounting and Commissioning
3.3 Commissioning

Direction Check with Load Current

3.3.10
Preliminary Remark
NOTE
i
i
The direction check is only relevant for devices with voltage transformers.
≥ 10 % of Load Current
The correct connection of the current and voltage transformers is tested via the protected line using the load
current. For this purpose, connect the line. The load current the line carries must be at least 0.1 · Ι
load current should be in-phase or lagging the voltage (resistive or resistive-inductive load). The direction of
the load current must be known. If there is any doubt, network or ring loops should be opened. The line
remains energized during the test.
The direction can be derived directly from the operational measured values. Initially the correlation of the
measured load direction with the actual direction of load flow is checked. In this case the normal situation is
assumed whereby the forward direction (measuring direction) extends from the busbar towards the line
P positive, if active power flows into the line,
P negative, if active power flows towards the busbar,
Q positive, if reactive power flows into the line,
Q negative, if reactive power flows toward the busbar.
[lastscheinleistung-110402-wlk, 1, en_US]
Figure 3-25
All signs of powers may be inverted deliberately. Check whether polarity is inverted in address 1108 P,Q
sign in the P.System Data 2. In that case the signs for active and reactive power are inverse as well.
The power measurement provides an initial indication as to whether the measured values have the correct
polarity. If both the active power and the reactive power have the wrong sign and 1108 P,Q sign is set to
not reversed, the polarity according to address 201 CT Starpoint must be checked and corrected.
However, power measurement itself is not able to detect all connection errors. For this reason, directional
messages should be generated by means of the directional overcurrent protection. Therefore, pickup thresh-
olds must be reduced so that the available load current causes a continuous pickup of the element. The direc-
tion reported in the messages, such as
actual power flow. Be careful that the "Forward" direction of the protective element is in the direction of the
line (or object to be protected). This is not necessarily identical with the direction of the normal the power
flow. For all three phases, the directional messages to the power flow must be reported properly.
If all directions differ from each other, individual phases in current or voltage transformer connections are
interchanged, not connected properly or phase assignment is incorrect. After isolation of the line and short-
circuiting of the current transformers the connections must be checked and corrected. The measurements
must then be repeated.
Finally, switch off the protected power line.
344
Apparent Load Power
Phase A forward or Phase A reverse must correspond to the
Nom
SIPROTEC 4, 7SJ80, Manual
E50417-G1140-C343-A8, Edition 12.2017
. The

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Siprotec 7sj80Siprotec 4 7saj8

Table of Contents