Omron SYSMAC CS Series Operation Manual page 290

Loop control boards, process-control cpu units, loop controller, loop-control cpu units
Hide thumbs Also See for SYSMAC CS Series:
Table of Contents

Advertisement

How to Use the Sequence Table Block
Specifying two or more Step Transitions (Branching)
A different destination step can be specified for each rule in a step, so more than one destination step can be
specified in a step. This feature allows control parameters, such as SP and PID settings, to be changed for dif-
ferent production models.
Branch
Step 01
Example)
Step 01
Changing the destination step for
different models
Rule
01
Step
01
I/O
A
Y
B
C
D
E
Next
THEN
03
step
Processing moves to step 03 when the
condition of step 01 rule 01 is true.
Processing moves to step 02 when the
condition of step 01 rule 02 is true.
When there are two or more valid step transitions in a single step (the conditions for two or more rules control-
ling step transitions are met), processing will move to the step indicated by the lowest-numbered rule. The
step(s) indicated by higher-numbered rule(s) will not be executed after the step indicated by the lowest-num-
bered rule.
258
Step 02
Step 03
Step 04
Step 02
SP=50, P=10
02
01
I/O
A
Y
B
Y
C
D 10
E 30
Model B
02
Next
step
Model A
Step 03
SP=100, P=30
I/O
A
B
C
D 10
E 30
Next
step
Rule
03
Step
02
Y
Y
Y
Y
THEN
04
05
Rule
Step
03
Y
Y
N
Y
Y
THEN
Appendix B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents