Siemens CP 1515 User Manual page 76

Industrial ethernet wireless lan rlm manager
Hide thumbs Also See for CP 1515:
Table of Contents

Advertisement

The "Link Test" window provides you with three link test options to assist
you in analyzing the link test data:
- provides measurement results of the link test.
- provides graphical results of the link quality.
- set the measurement parameters to record test results
for future analysis.
76
Industrial Ethernet Wireless LAN RLM Manager, CP 1515 Manager
C79000-G8976-C171-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic net

Table of Contents