The "Link Test" window provides you with three link test options to assist
you in analyzing the link test data:
•
- provides measurement results of the link test.
•
- provides graphical results of the link quality.
•
- set the measurement parameters to record test results
for future analysis.
76
Industrial Ethernet Wireless LAN RLM Manager, CP 1515 Manager
C79000-G8976-C171-01