ESIE09-08B
7.5
External Backup Heater Control
Normal operation
NORMAL OPERATION
(BUH assistance)
Step 0 -> Step 1
&
Step 1 / 2 -> Step 0
or
Step 1 -> Step 0
Step 1 -> Step 2
&
Step 2 -> Step 1
or
Step 0 -> Step 2
&
(*): approximate value (depends on operation conditions (e.g. dT, HP indoor unit))
Appendix
Step 0
(no BUH operation)
TM
TM
TM
1
1
2
Step 1
TM
2
Step 2
20 minutes compressor operation
Compressor runs on high frequency
Pump speed > ~2500 rpm (with E-03 set to default 1)
LWT > ~ LWT setpoint - 8 (*)
LWT < ~ LWT setpoint - 4 (*)
If controller room thermostat function: RT<RT setpoint - 2 (normal heat load)
Q2L = OFF
DHW operation
LWT > LWT setpoint + 2
If room thermostat function: RT > RT setpoint
LWT > LWT setpoint
TM2 up
LWT < ~ LWT setpoint - 6 (*)
RWT < ~ LWT setpoint - 10 (*)
LWT > ~ LWT setpoint - 2,5 (*)
RWT > ~ LWT setpoint - 6 (*)
20 minutes compressor operation
Compressor runs on high frequency
Pump speed > ~2500 rpm (with E-03 set to default 1)
LWT < ~ LWT setpoint - 8 (*)
Note
Timer during normal operation
The TM* indicate timers, these start counting down if they
are crossed when going from one step over to another
step.
TM1: 5 minutes
TM2: 10 minutes
BUH operation after defrost if already active before
Timer: 10 minutes
Compressor operation: 5 minutes & high frequency
External Backup Heater Kit
251