Alcatel-Lucent 9558HC User Manual page 9

Microwave packet radio for ansi/etsi
Table of Contents

Advertisement

MPT-HC V2/MPT-XP/9558HC removal and replacement...........................................................................477
Replacement of an MPT-HC V2/MPT-XP in XPIC configuration ...........................................................478
MPT-MC removal and replacement ............................................................................................................478
Cleaning ...........................................................................................................................................................478
Line–up and commissioning ............................................................................................................. 479
Introduction.......................................................................................................................................................479
General........................................................................................................................................................479
Safety–EMC–EMF–ESD norms and cautions to avoid equipment damage ...............................................481
Summary of the line–up, commissioning, and acceptance phases.............................................................481
MCT connection ..........................................................................................................................................483
How to access the remote NE .....................................................................................................................484
Option 1: with OSPF ..............................................................................................................................485
Option 2: without OSPF .........................................................................................................................485
How to access the remote MPR-e in Single NE mode with 7705 SAR .......................................................486
Commissioning of STATION A – phase 1 (Turn up) ........................................................................................487
Turn–on preliminary operations...................................................................................................................487
Powering up the MPT..................................................................................................................................488
Commissioning of STATION B – phase 1 (Turn up) ........................................................................................489
Fine antenna alignment and preliminary checks – Stations A & B ...................................................................489
Fine antenna alignment ...............................................................................................................................489
Preliminary checks ......................................................................................................................................489
Verify MPT alarm status .........................................................................................................................490
Transmitter power output check .............................................................................................................490
Received power measurement ..............................................................................................................490
End of commissioning phase 1 (turn up) in STATION A ..................................................................................491
Commissioning station A – phase 2 (acceptance test).....................................................................................491
Installation and cabling visual inspection ....................................................................................................493
Indoor system installation and cabling visual inspection ........................................................................493
Outdoor system installation and cabling visual inspection .....................................................................493
System configuration ...................................................................................................................................493
Check software release (valid for MPR-e standalone only) ...................................................................493
Check/set mode (fixed or adaptive modulation), channel spacing, modulation .....................................493
Check/set Tx/Rx spacing, transmission and reception frequencies .......................................................494
Check/set Tx power (ATPC Off) or Tx range and Rx threshold (ATPC on) ...........................................494
Check/set the XPIC (only with MPT-HC V2/MPT-XP, if the co-channel XPIC configuration
has to be used) ......................................................................................................................................494
Check/set Link identifier configuration (optional) ...................................................................................494
Check/set the synchronization ...............................................................................................................495
Tx and Rx power measurement (with MCT) ..........................................................................................495
Check/set the 1+1 HSB (only with MPT-HC V2/MPT-XP connected to 7705 SAR-8/18) ......................495
Ethernet traffic QoS.....................................................................................................................................495
NE configuration..........................................................................................................................................496
Check/set the local NE IP address (valid for MPR-e standalone only) ..................................................496
Check/set the TMN in-band configuration ..............................................................................................496
Check/set OSPF configuration (valid for MPR-e standalone only).........................................................496
Check/set IP static routing configuration (valid for MPR-e standalone only)..........................................496
Data/time settings (valid for MPR-e standalone only) .................................................................................497
Ethernet traffic hop stability test with MPR-e standalone ............................................................................497
MPR-e
Table of Contents
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mpr-eMpt-mc9500Mpt-hc v2Mpt-xp

Table of Contents