Download Print this page

Arrow Storage Products DKGA-A Owner's Manual And Assembly Manual page 13

Commander series, mountaineer series

Advertisement

Step 4: Wall Panels
Whenever a crimped rib and an uncrimped rib
meet, the crimped rib should be placed UNDER
the uncrimped rib if possible.
Crimped Rib
Use the diagram to the right when attaching Wall Panels.
• Secure the top row to Top Frames
• Secure the middle row to Wall Channels
• Secure the lower row to Floor Frames
• Secure the circled holes to the Panel next to it
IMPORTANT:
When installing the Wall
Panels over a Truss, you will need to 'roll'
the Panels as shown to be able to attach the
next Panel at the overlap. When securing the
Panel to the building with Small Screws, do
not insert Screws in the row of holes closest
to the last rib of the Panel. Next, roll the Panel
back slightly and attach the next Panel at the
overlap with a Bolt and Nut in the center hole.
Once this is done, continue securing the Panel
to the building.
Uncrimped Rib
13
FASTEN TO TOP FRAMES
FASTEN TO WALL CHANNELS
FASTEN TO FLOOR FRAMES
LEAVE LAST ROW OF HOLES EMPTY
UNTIL NEXT PANEL IS IN PLACE
13AG

Advertisement

loading