Download Print this page

Advertisement

Quick Links

722400816
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!
Customer Service:
1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Storage
Size
10' x 8'
77 Sq. Ft. 520 Cu. Ft.
2
3,0 m x 2,4 m
7,2 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
(Roof Edge to Roof Edge)
Area
Width
123 1/4"
14,7 m 3
313,1 cm
252,7 cm
Depth
Height
Width
99 1/2"
90 3/4"
118 1/4"
230,5 cm
300,4 cm
www.arrowsheds.com
Model No.
10' x 8'
Base
Size
307,3 cm x 246,4 cm
For proper base construction see page 12
Interior Dimensions
(Wall to Wall)
Depth
Height
94 1/4"
89 1/4"
239,4 cm
226,7 cm
01BV
DS108-A
Nominal Size
121" x 97"
Door
Opening
Width
Height
59 1/2"
69 1/4"
151,1 cm
175,9 cm

Advertisement

loading

Summary of Contents for Arrow Storage Products DS108-A

  • Page 1 01BV 722400816 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. DS108-A 10’ x 8’ Gloves must be worn at all times to reduce risk of injury! Nominal Size Customer Service: 1-800-851-1085 Base 121” x 97” assist@arrowsheds.com Size 307,3 cm x 246,4 cm BUILDING DIMENSIONS †...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3: What You Need

    ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4: Frequently Asked Questions

    FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6 What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... Part Hardware Views by Key No. Part Qty. Description List 65103 Hex Nut (#8-32) 65923-33 Small Bolt (Sand) (#8-32 x 3/8) (10 mm) #2 Phillips #2 Phillips 11/32 Hex. 65923-18 Small Bolt (Java) (#8-32 x 3/8) (10 mm) 65004-33 Small Screw (Sand) (#8AB x 5/16) (8 mm) 65004-18 Small Screw (Java) (#8AB x 5/16) (8 mm) 66783...
  • Page 8 PARTS LIST... Part Part Qty. Selected End Views by Key No. Description List 6635 Roof Beam Bracket 9009 Gable Brace 9204 Roof Beam Brace 5210 Wall Panel 6521 Wall Panel 7571 Roof Panel 7743 Roof Panel 8576 Right Gable 8577 Left Gable 10 10699 Front Wall Panel 11 10700 Right Roof Panel...
  • Page 9 ASSEMBLY BY KEY NO. Walls Floor...
  • Page 10 ASSEMBLY BY KEY NO. Roof Doors...
  • Page 11: Assembly Overview

    ASSEMBLY OVERVIEW Install Corner Panels, Side Angles, Build the Floor Frame Rear Angles, and Front Header Install Wall Panels, Wall Channels, and Attach Gables and Roof Beams Door Jambs Install Roof Panel, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frames You will need for this page: 10704 Washers are to be used on painted parts only. Washers are not necessary on unpainted Side Floor parts and there are not enough to use on (QTY: 8) Frame every screw and bolt.
  • Page 14 Step 1: Continued You will need for this page: 10703 Front/Rear (QTY: 8) Floor Frame Overlap two (2) Front/Rear Floor Frames as 10703 shown and secure with four (4) Bolts and Nuts. Two (2) Sand Bolts and Nuts must enter from bottom.
  • Page 15 Step 2: Wall Frames You will need for this page: 5986 9917 Rear Channel Rear Angle (QTY: 2) 5986 9917 Overlap two (2) Rear Wall Angles so that fi ve (5) holes align as shown. Insert one (1) Sand Bolt and Nut through the center hole.
  • Page 16 Step 2: Continued You will need for this page: 10715 10706 10706 Side Channel Side Angle (QTY: 4) Overlap two (2) Side Wall Angles so that three (3) holes align as shown. Insert one (1) Sand Bolt and Nut through the center hole. Set aside for use in Step 10. 10715 10706 Overlap parts so three...
  • Page 17 Step 3: Header You will need for this page: 10707 10708 Front Inner Front Outer (QTY:2) Header Header Connect the Front Inner Header to a Front Outer 10708 Header using one (1) Sand Screw as shown. Repeat this for the opposite end. Set aside for use in Step 10.
  • Page 18 Step 4: Roof Beams You will need for this page: 10713 10713 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) Sand Bolts and Nuts as shown below. Overlap parts so the bottom slots align.
  • Page 19 Step 4: Continued You will need for this page: BUILD ONE (1) DOUBLE (MAIN) BEAM 10713 10713 Roof Beam (QTY: 14) 10713 Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly.
  • Page 20 Step 5: Door Pre-Assembly You will need for this page: 10782 10718 10719 10720 67236 Horizontal Door Handle Diagonal Door Adhesive Pad Door Panel (QTY: 2) Door Brace Brace Brace (QTY: 24) Start assembly by sliding the Door Handle Place the ends of Diagonal Door Braces Brace into the middle of the Door and securing with small holes under Horizontal Door it with four (4) Sand Screws.