Operation; Startup; Load Material - Graco PCF Instructions - Parts Manual

Precision dispense system
Hide thumbs Also See for PCF:
Table of Contents

Advertisement

Operation

Startup

Initial Startup
1. Ensure the PCF control center is installed and all of
the proper connections to and from the control cen-
ter have been made. Ensure fittings are tight.
2. Read and understand the Operation (page 33) and
Advanced Display Module (ADM) (page 14) sec-
tions of this manual.
3. Continue startup with Step 2 in Standard Startup.
Standard Startup
1. Carefully inspect the entire system for signs of leak-
age or wear. Replace or repair any worn or leaking
components before operating the system.
2. Press the Stop button (BC). See F
3. Turn on air and electrical power to the system.
4. Turn on the main power to supply power to the PCF.
5. Check Interface Signals: If this is a new installa-
tion, power on each system input and verify that
each input is being received.
6. Turn on the material supply system.
313377L

Load Material

Before using the system material must be loaded into
the supply system.
1. If this is a new installation, follow the Initial Start up
2. Turn on the fluid supply pressure to the fluid plate
3. Place the gun(s) over a waste container.
4. Enter the maintenance screen. See Dispense
5. Select a control mode. See Dispense From Main-
. 7.
6. If the system status indicator LED (BB) is orange,
IG
7. Press and hold
8. Press
procedure. Otherwise, follow the Standard Startup
procedure. See page 33.
assembly.
From Maintenance Screen, page 36.
tenance Screen, page 36.
press
to turn the system on.
. Dispense fluid until clean,
air-free fluid flows from the gun.
again to exit maintenance screen.
Operation
33

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents