Primary Node Cabling Instructions; Standby Node Cabling Instructions - Dell Data Domain DD9500 Hardware Overview And Installation Manual

Hide thumbs Also See for Data Domain DD9500:
Table of Contents

Advertisement

Table 16 Primary node cabling instructions
String
I/O - Port
(Loop)
1
I/O 3 - Port 1
1
I/O 2 - Port 0
2
I/O 3 - Port 0
2
I/O 6 - Port 1
3
I/O 2 - Port 1
3
I/O 6 - Port 0
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be
used.
Table 17 Standby node cabling instructions
String
I/O - Port
(Loop)
1
I/O 3 - Port 1
1
I/O 2 - Port 0
2
I/O 3 - Port 0
2
I/O 6 - Port 1
3
I/O 2 - Port 1
3
I/O 6 - Port 0
a.
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be
used.
Shelf Port
B controller HOST
port of shelf V1.1
A controller HOST
port of the highest number
shelf in V1
B controller HOST
port of shelf V2.1
A controller HOST
port of the highest number
shelf in V2
B controller HOST
port of shelf V3.1
A controller HOST
port of the highest number
shelf in V3
Shelf Port
A controller EXPANSION
B controller EXPANSION
number shelf in V1
A controller EXPANSION
B controller EXPANSION
number shelf in V2
A controller EXPANSION
B controller EXPANSION
number shelf in V3
DD9500 /DD9800 with HA (one rack)
Connect Cables and Power on
Length
2M
2M
2M
2M
2M
2M
Length
2M
port of shelf V1.1
2M
port of the highest
2M
port of shelf V2.1
2M
port of the highest
2M
port of shelf V3.1
2M
port of the highest
a
a
59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Data domain dd9800

Table of Contents