DD9800 with HA (one rack)

For an HA DD9800 pair in one rack:
Table 12. DD9800 with ES30 HA primary node cabling instructions (one rack)
String
I/O - Port
(Loop)
1
I/O 3 - Port 1
1
I/O 2 - Port 0
2
I/O 3 - Port 0
2
I/O 6 - Port 1
3
I/O 2 - Port 1
3
I/O 6 - Port 0
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
a.
Table 13. DD9800 with ES30 HA standby node cabling instructions (one rack)
String
I/O - Port
(Loop)
1
I/O 3 - Port 1
1
I/O 2 - Port 0
2
I/O 3 - Port 0
2
I/O 6 - Port 1
3
I/O 2 - Port 1
3
I/O 6 - Port 0
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
a.
Shelf Port
B controller HOST
port of shelf V1.1
A controller HOST
port of the highest number shelf in V1
B controller HOST
port of shelf V2.1
A controller HOST
port of the highest number shelf in V2
B controller HOST
port of shelf V3.1
A controller HOST
port of the highest number shelf in V3
Shelf Port
A controller EXPANSION
B controller EXPANSION
A controller EXPANSION
B controller EXPANSION
A controller EXPANSION
B controller EXPANSION
port of shelf V1.1
port of the highest number shelf in V1
port of shelf V2.1
port of the highest number shelf in V2
port of shelf V3.1
port of the highest number shelf in V3
Connect Cables and Power On
a
Length
2M
2M
2M
2M
2M
2M
a
Length
2M
2M
2M
2M
2M
2M
59