Powering On Procedures For Powerstore Node; Power On A Powerstore T Model Node Using A Service Script; Power On A Powerstore T Model Node By Reseating The Node - Dell PowerStore 500T Installation And Service Manual

Hide thumbs Also See for PowerStore 500T:
Table of Contents

Advertisement

The login prompt indicates the node that you are logged into. For example, the letter "A" in the prompt
[SVC:user@FNM12345678910-A~]$ indicates that you are logged into node A.
3. Based on the node you are logged into, run one of the following commands:
● svc_node shutdown local to power off the node you are logged into.
● svc_node shutdown peer to power off the peer node.
Next steps
To verify that the node has powered off, check the status of the LEDs in the rear of chassis. Other than the LEDs for the power
supply unit, management port, and service port, all LEDs on the node must be OFF. The Unsafe to Remove LED on the active or
peer node is ON.

Powering on procedures for PowerStore node

This section includes the following procedures:

Power on a PowerStore T model node using a service script

Power on a PowerStore T model node by reseating the node

Power on a PowerStore T model node using a service script
Prerequisites
Obtain the following information:
● Management IP address of the appliance that contains the node. In PowerStore Manager, go to Settings > Networking
> Networking IPs > Management. Review the Management IPs table to identify the management IP address associated
with the appliance.
● Service account credentials
About this task
Use the following procedure to power on (power up) a PowerStore T model node in scenarios such as:
● You are remote and cannot reseat the node.
● Node was not removed from the chassis.
● Embedded module, I/O module, and 4-port card were replaced.
Steps
1. Launch an SSH client, and connect to the appliance using the management IP address. Since only the peer node is powered
on, you are connected directly to the peer node of the appliance.
2. Enter the username and password that is associated with the service account, and log in.
3. Run the following command:
svc_node power_on
4. Wait for the node to power on.
Power on a PowerStore T model node by reseating the node
About this task
Use the following procedure to power on (power up) a PowerStore T model node when it was removed from the chassis:
Steps
1. Reseat the node into the chassis.
The node will power on automatically.
2. Reconnect the power cable.
3. Wait for the node to complete powering on.
58
Power control procedures
on page 58
on page 58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents