Figure 4-48 Sample Completed Electrical Load Tabulation Form, Sheet 2 of 2

4.6 Electrical Bonding

The GAD 29/29B is the only LRU installed by this STC that requires bonding. The following
sections present data on acceptable methods of electrical bonding for the GAD 29/29B.
Electrical bonding can be achieved with mounting hardware (rivets, bolts, nuts, washers, etc..)
or via bond straps. A reliable electrical bond rely on mated surfaces to be clean of any
primer/grease/dirt. When bolts are used to secure racks/brackets/etc.. and are relied upon for
Garmin G5 Electronic Flight Instrument Part 23 AML STC Installation Manual
190-01112-10
Rev. 9
Page 80