Chapter 4 Procedures Before Operation - Mitsubishi Electric MELSEC-L SSCNETIII/H User Manual

Melsec-l series, head module
Table of Contents

Advertisement

CHAPTER 4
This chapter describes the procedures before operating the head module.
For start-up examples, refer to the user's manual for the Motion controller used.
Checkbox
System consideration
Consider the system configuration and link device assignment.
Installation
Install the power supply module, head module, I/O module(s),
intelligent function module(s), and an END cover.
Perform unit tests on the head module and intelligent function module(s).
Connection
Connect an SSCNET III cable to the head module.
Configuration
Set parameters for each module.
Starting data link
Start data link.
PROCEDURES BEFORE OPERATION
Unit test

CHAPTER 4 PROCEDURES BEFORE OPERATION

Page 31, CHAPTER 5,
Page 65, CHAPTER 8
Page 35, Section 6.1,
Page 36, Section 6.2,
Page 44, Section 6.3
Page 44, Section 6.4
Page 46, Section 6.5
Page 53, CHAPTER 7,
Page 65, CHAPTER 8
Page 20, CHAPTER 2,
Page 65, CHAPTER 8
4
29

Advertisement

Table of Contents
loading

Table of Contents