Wiring To The Power Supply Modules; Testing The Head Module Before Wiring - Mitsubishi Electric MELSEC-L SSCNETIII/H User Manual

Melsec-l series, head module
Table of Contents

Advertisement

6.3

Wiring to the Power Supply Modules

For information on wiring to the power supply modules, refer to the following.
 MELSEC-L CPU Module User's Manual (Hardware Design, Maintenance and Inspection)
6.4

Testing the Head Module Before Wiring

(1) Unit test
Run a unit test to check if there is any abnormality in the head module hardware.
Select "Self Test".
44
1.
Connect the modules as shown left. Connect the
head module to GX Works2.
2.
Set the PLC parameter in GX Works2 as shown left.
Project window  [Parameter]  [PLC Parameter]
 "Communication Head Setting"
3.
Write the PLC parameter set in GX Works2 to the
head module.
[Online]  [Write to PLC...]

Advertisement

Table of Contents
loading

Table of Contents