Before Disassembling The Coffee System - Jenn-Air JBC7624BS Technical Education

Built-in coffee system
Hide thumbs Also See for JBC7624BS:
Table of Contents

Advertisement

COMPONENT ACCESS
WARNING
small cup, medium cup, large cup or mug.
make 2 cups of coffee.
Electrical Shock Hazard
the coffee. After the preset quantity of coffee has been
Disconnect power before servicing.
dispensed, the coffee system will automatically stop and
E
D
C
Replace all parts and panels before operating.
empty the coffee grounds into the grounds container.
Failure to do so can result in death or
NOTE: The coffee system can be interrupted at any time by
pressing the 1 Coffee or 2 Coffee button again.
electrical shock.
Preparation
again.
Perform the following to prepare coffee system for
6. "TURNING OFF Please wait..." will be displayed. The coffee
button. The coffee system will run an automatic rinse cycle
disassembly.
and then go into standby mode.
system will turn off.
1. Slide the coffee system forward using the handles as
7. Slide the coffee system forward using the handles as shown
shown in the following illustration.
in the following illustration.
A
WARNING
B
A. Cup tray
B. Service door
Excessive Weight Hazard
C. Coffee feed
D. Coffee grounds container
Use two or more people to move and install the built-in
coffee system.
A
Failure to do so can result in back or other injury.
Run a Rinse cycle before brewing coffee. See "Rinsing" in the
1. Pull the runners forward until they are fully extended and in
"Settings" section.
the locked position.
Do not use very thick cups as they will absorb the heat unless
2. Using 2 or more people, position the coffee system onto the
preheated.
runners, making sure that the 4 pins of the L-brackets fit
securely inside the holes on the bottom of the coffee system.
Preheat all cups by rinsing them with hot water. See "Rinsing"
in the "Settings" section.
8. Open the coffee bean container lid, fill the coffee bean
2. Press main on/off switch (A) on right side of coffee system
container with coffee beans and close the lid.
to turn off unit.
IMPORTANT: Do not place ground coffee, freeze-dried
coffee, caramelized coffee or foreign objects into the coffee
bean container, as they could damage the machine.
spout.
A
A
A. Main on/off switch
B. Grinding coarseness adjustment knob
C. Coffee bean container
D. Coffee bean container lid
A. Coffee spout
B. Service door
A. 1 Coffee
B. 2 Coffee
4-8
Jenn-Air Built-in Coffee System
C. Menu
n
3. Place the level on top of the coffee system and check
levelness of the coffee system, first side to side; then front to
back.

Before Disassembling the Coffee System

F
G
Install the Coffee System
L
E. Brewing unit
F. On/standby button
G. Cup tray lights
H. Control panel
A
A. Handles
COFFEE SYSTEM USE
A
C
B
D
B
A. Main On/Off Switch
E. Ground coffee funnel cap
B. Storage Tray
G. Scoop compartment
A
F. Scoop
K
H. Ground coffee funnel feed
D. Strength
A. Pins
E. Display
F. Down arrow key
3. Unplug coffee system or disconnect power.
4. Remove power cord from power cord clip in cabinet.
5. Remove all items from right and left storage trays ("B"
in previous illustration), e.g., bags of coffee beans,
containers of ground coffee, sugar, creamer, etc.
6. If installed, remove hot water spout or milk container.
7. Remove water tank ("B" in following illustration).
2. Remove the drip tray and clean it.
8. Open service door (D) and remove drip tray (C) with
NOTE: When cleaning the coffee system, always fully remove
coffee grounds container (A).
the drip tray.
H
I
D
A. Coffee grounds container
B. Water Tank
3. Empty the coffee grounds container and replace it.
4. If the coffee system is not level: Using 2 or more people,
K
J
9. Remove the four 4.2 x 9.5 mm screws (C) securing
NOTE: Every time the drip tray is removed, the coffee
remove the coffee system from the runners. Add the
the coffee system to the runners. Refer to following
grounds container must be emptied. Failure to do so may
necessary leveling spacers over the pins to help level the
I. Hot water and steam nozzle
illustration.
clog the coffee system.
coffee system.
J. Water tank
K. Coffee spout (height-adjustable)
4. Replace the drip tray and close the service door.
L. Drip tray
Changing the Amount of Coffee
The coffee system is factory-set to automatically deliver
approximately the following amounts of coffee:
Espresso: 1 oz (30 mL)
I
9. Push the coffee system back into the housing. It is now ready
Small cup: 1½ oz (45 mL)
I
for normal use.
Medium cup: 2 oz (60 mL)
I
NOTE: When first using the coffee system, you need to make 4-5
Large cup: 3 oz (90 mL)
I
cups of coffee and 4-5 cappuccinos before the coffee system
gives good results.
Mug: 4 oz (120 mL)
I
NOTE: Each time the machine is turned on using the main On/Off
These settings can be adjusted up to 6 oz (180 mL).
switch, it runs a self-diagnosis function and then goes into
NOTE: The 2 Coffee button can be used to dispense twice as
standby mode. To turn the machine on again, press the On/
much coffee as the 1 Coffee button even with custom settings. If
Standby button to the left of the coffee spout. See the illustration
you wish to return to the original settings, see "Default Values" in
in the "Parts and Features" section.
the "Settings" section.
1. Press SIZE until the display shows the desired coffee size.
2. Place your cup beneath the coffee spout. Press and hold
1 COFFEE until "PROGRAM QUANTITY" is displayed.
NOTE: The coffee system will begin dispensing coffee before
"PROGRAM QUANTITY" is displayed.
E
3. Press 1 COFFEE again to stop the runoff and save the
desired amount of coffee for the size.
The machine is now reprogrammed and ready for use.
5. Using 2 or more people, position the coffee system onto the
B
10. Remove the coffee system from the runners and relocate
runners, making sure that the 4 pins of the L-brackets fit
to an appropriate work surface.
securely inside the holes on the bottom of the coffee system.
I. Power supply cable
6. Check that the coffee system is level. If it is not level, repeat
J. Terminal board
steps 4 and 5. If it is level, secure the coffee system to the
K. Storage tray
L-brackets with the 4 screws.
7. Position the power supply cord clip on the top of the cabinet,
G. Up arrow key
approximately 14" (35.6 cm) from the front of the cabinet and
H. Hot water
centered from left to right. With a pencil, mark the hole
I. Cappuccino
through the clip on the top of the cabinet.
8. Using a 2 mm drill, drill the hole marked in Step 7.
Settings
9. Using 1 screw, attach the power supply cord clip to the top of
the cabinet.
A
A
B
B
C
A. Coffee grounds container
C. Drip Tray
B. Drip tray
D. Service Door
A
A. Coffee bean container
A
B
C
F
A. Leveling spacers
G
H
B. Pins
C. Screws
J
J. OK
K. Size
I

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents