GE CareScape V100 Service Manual page 84

Vital sings monitor
Hide thumbs Also See for CareScape V100:
Table of Contents

Advertisement

4-26
Maintenance: Safety testing
6.
Read the current leakage indicated on the tester and record the results on
the
"Test results form"
7.
Change leakage tester switches to:
Polarity – NORMAL
Neutral – CLOSED
GND (Earth) – OPEN
8.
Read the current leakage indicated on the tester and record the results on
the
"Test results form"
9.
Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – OPEN
10. Read the current leakage indicated on the tester and record the results on
the
"Test results form"
11. Change leakage tester switches to:
Polarity – REVERSED
Neutral – OPEN
GND (Earth) – CLOSED
12. Read the current leakage indicated on the tester and record the results on
the
"Test results form"
13. Change leakage tester switches to:
Polarity – REVERSED
Neutral – CLOSED
GND (Earth) – CLOSED
14. Read the current leakage indicated on the tester and record the results on
the
"Test results form"
15. Remove the AC mains voltage from the device under test.
16. Repeat the steps in this procedure using the appropriate Test Body for any
additional devices requiring safety testing.
If measured reading is greater than the acceptance criteria below, the device
under test fails. Contact GE Technical Support.
Acceptance criteria NC
All readings must be less than or equal to 100 µA.
Acceptance criteria SFC
All readings must be less than or equal to 500 µA.
CARESCAPE V100 Vital Signs Monitor
on page 4-29.
on page 4-29.
on page 4-29.
on page 4-29.
on page 4-29.
ground (earth), line or neutral open
2048723-002C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents