SMA SUNNY SENSORBOX Installation Manual page 69

System monitoring
Hide thumbs Also See for SUNNY SENSORBOX:
Table of Contents

Advertisement

SMA America, LLC
3. Unscrew the old cable gland from the
Sunny SensorBox.
4. Place the appropriate gasket ring onto the thread
of the new cable gland.
NOTICE
Ingress of water.
Damage to the Sunny SensorBox will result.
• Ensure the gasket is properly seated in the
cable gland.
5. Screw the cable gland into the Sunny SensorBox with a torque of 7 in‑lbs. (0.8 Nm).
6. Remove the porous rubber seal in the Sunny SensorBox lid and replace it with the new one.
7. Reinsert the relevant cable into the enclosure and make all the necessary connections.
8. Make sure the cable opening seals of the cable gland are seated properly.
9. Screw the lock nuts onto the cable gland with a torque of 7 in‑lbs. (0.8 Nm).
10. Close the Sunny SensorBox (see page 66).
☑ The gaskets of the cable gland have been replaced.
Installation Manual
Maintenance and care
Sensorbox-eng-IA-IUS-112515
69

Advertisement

Table of Contents
loading

Table of Contents