SMA SUNNY SENSORBOX Installation Manual page 62

System monitoring
Hide thumbs Also See for SUNNY SENSORBOX:
Table of Contents

Advertisement

Startup
15. Connect the wires to the "RS485 F1: IN" terminal of
the Sunny SensorBox. Observe the noted wire colors.
16. Make sure the termination resistor is plugged into the
"RS485 F2: OUT" terminal. The termination resistor
must be plugged in.
17. Make sure the gasket of the cable gland is properly seated.
18. Screw the lock nut onto the cable gland with a torque of 7 in‑lbs. (0.8 Nm).
☑ The SMA Power Injector with Bluetooth is connected to the Sunny SensorBox. You can now use
the SMA Power Injector with Bluetooth to supply power to the Sunny SensorBox.
62
Sensorbox-eng-IA-IUS-112515
SMA America, LLC
Installation Manual

Advertisement

Table of Contents
loading

Table of Contents