DAIR- 1.0.0 ISOLATE ACTUATOR-TEST BOARD CONTROL
a) Enter Service Mode → Calibrate Hydraulics → Deaeration Pressure but
yet!
b) Per the Figure below, ENSURE the [PUMP RATE] box = 0!
Figure 83 – Calibrate Deaeration Pressure Screen
DEAERATION MOTOR'S
c) Figure right, is the
shaft rotating (Yes or No)?
Yes
Shaft rotating! If [PUMP RATE] DOES
NOT = 0 return to part a. If (and ONLY if)
[PUMP RATE] = 0 replace the Actuator-
Test Board.
No
NOT rotating! See procedure number
DAIR- 1.1.0
(page 498).
DAIR- 1.1.0 CHECK DEAERATION MOTOR
ENSURE
a)
the Loading Pressure gauge (yellow connector) reads 0 psi before inserting it,
b) SLAM* the gauge into the Acetate/Acid rinse port. *ELSE pressure will not be read correctly!
c) Press 'CONFIRM'. The screen says "4. Adjust PUMP RATE..." AND the [Pump Rate] box is yellow!
d) Does Loading Pressure (Rinse port gauge) PEAK to at least 16 psi?
Yes
16 psi or more! See procedure number
No
Less than 16 psi! Perform parts a THROUGH d below:
a) If the [Pump Rate] window box is LESS THAN 210 set it to 210 and press 'CONFIRM'. If
Loading Pressure remains less than 16 psi see part b. If at least 16 psi see procedure
number
b) Press 'CONFIRM' to save the calibration then turn the machine off.
Parts c and d next page
SECTION 13 - DEAERATION PROBLEMS
DAIR- 2.0.0
(page 499).
2008K/K2 Troubleshooting Guide
P/N 507298 Rev. H
DO NOT
DAIR- 2.0.0
(page 499).
press 'CONFIRM'
Page 498