Suspended Ceiling Installation-Drop Ceiling Tiles - Enterasys RoamAbout RBT-1602 Installation Manual

Hide thumbs Also See for Enterasys RoamAbout RBT-1602:
Table of Contents

Advertisement

Installing the Access Point
12. Lock the access point onto the bracket by inserting the 3‐mm or 1/8‐inch screwdriver into the 
Lock hole on the access point as shown in Figure
Figure 2-9
13. To ensure that the access point is fully locked onto the bracket, gently pull down on the access 
point and attempt to rotate it from side to side.
14. If the access point comes off the bracket, relock the device onto the bracket as described in 
Step
15. If the other ends of the Cat 5 cable(s) are not already connected and the link activated, go to 
"Connecting an Access Point to the Network" on page
Health" on page 2‐26.
Suspended Ceiling Installation—Drop Ceiling Tiles
(For required mounting hardware and tools, see Table
1.
Select an installation location that is centered over a T‐bar in the ceiling.
2.
Cut a hole as follows in the ceiling tile for the Cat 5 cable(s):
a.
b. Use the box cutter to cut along the line marking the opening for the port connectors.
c.
2-10 Installing and Connecting the Access Point
Caution: To prevent possible damage to the access point, make sure the device is fully locked
onto the bracket before letting go of it.
Advertencia: para evitar posibles daños al punto de acceso, asegúrese de que el dispositivo
esté completamente fijo al soporte antes de soltarlo.
Achtung: Vergewissern Sie sich stets, dass der Access Point vollständig in die Halterung
eingerastet ist, um so Beschädigungen zu vermeiden.
Step 11—Locking the Bracket
12 on page 2‐10.
Place the mounting template over the area where you plan to install the access point.
Remove the mounting template and the material you cut from the ceiling panel.
2‐9.
Lock
T-bar
2‐25. Otherwise, go to "Verifying AP 
2‐2 on page 2‐5.)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Enterasys roamabout rbt-1602c

Table of Contents