Installation - Graco Reactor 2 E-XP2 Operation

Proportioning systems
Hide thumbs Also See for Reactor 2 E-XP2:
Table of Contents

Advertisement

Installation

Installation
Setup From Shipping Configuration
1. Remove bolts (A) and nuts.
2. Swing up the electrical enclosure and reinstall
bolt (A) with nut. Tighten bolt (B) and nut.
3. Position cable bundles against the frame and
attach to the frame with loose wire tie (C) on
each side.
To prevent serious injury due to system tipping
over, ensure Reactor is properly secured to wall.
Note
Mounting brackets and bolts are included in the box
of loose parts, shipped with your system.
26
1. Use the supplied bolts to install the supplied
L-brackets onto the system frame in the top-most
square holes. Install brackets on both the left
and right side of system frame.
2. Secure the L-brackets to the wall. If L-brackets
do not line up with the wall stud spacing, bolt a
piece of wood to the studs then secure L-brackets
to wood.
3. Use the four holes in the base of the system
frame to secure base to the floor. Bolts not
supplied.
333023D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 2 e-30

Table of Contents