Startup

To prevent serious injury, only operate Reactor
with all covers and shrouds in place.
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage fluctuations that can damage
electrical equipment and void the warranty.
1. Check fluid inlet filter screens.
Before daily startup, ensure that the
fluid inlet screens are clean. See
Flush Inlet Strainer Screen, page 55
2. Check ISO lubrication reservoir.
Check level and condition of ISO lube daily. See
Pump Lubrication System, page
333023D
3. Check generator fuel level.
4. Confirm main power switch is OFF before starting
5. Ensure the main breaker on the generator is in
6. Start the generator. Allow it to reach full operating
7. Turn main power switch ON.
56.
NOTICE
Running out of fuel will cause voltage
fluctuations that can damage electrical
equipment and void the warranty. Do not run
out of fuel.
generator.
the off position.
temperature.
The ADM will display the following screen until
communication and initialization is complete.
Startup
41