Function Of The Back-Up Battery; Programmer Functions - Siemens SIMATIC S5-90U System Manual

Table of Contents

Advertisement

S5-90U/S5-95U
4.4.2

Function of the Back-Up Battery

If the power fails or the programmable controller is switched off, the contents of the internal memory
are stored (retentive) only if a back-up battery is connected. When the programmable controller is
switched on, the following contents are available:
Control program and data blocks (see Chapter 7)
Retentive flags and counter values (see Chapter 2)
ISTACK contents (see Chapter 5)
System data (see Appendix B)
Note
Only Insert or replace the battery while the PLC is switched on. Otherwise, an
"OVERALL RESET" is required after POWER ON.
The S5-90U has no battery low LED.
If the S5-90U is briefly (approx. 20 ms to 10 s) in the POWER OFF state and no
battery back-up is provided, the PLC cannot recognize whether a backup battery is
available during the next restart.
Program data might be falsified in this way. You can help avoid a failure of the
battery back-up by regularly replacing the battery every year.
A yellow LED on the operator panel of the S5-95U signals a failure of the back-up
battery.
Warning
!
Do not recharge lithium batteries. Danger of explosion! Dispose of used batteries as
classified waste.
4.5

Programmer functions

The serial interface (programmer interface) can be used for connecting
Programmers or operator control and monitoring equipment,
The PLC as a station on the SINEC L1 LAN (see Chapter 14).
EWA 4NEB 812 6115-02b
Start-Up and Program Tests
4-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s5-95u

Table of Contents