Heatrun Test - Toshiba PORTEGE S100 Maintenance Manual

Hide thumbs Also See for PORTEGE S100:
Table of Contents

Advertisement

3.5 Heatrun Test

3.5
Heatrun Test
To execute this program, select 3-Repair heatrun in the startup menu, press Enter.
When selecting the option you want to execute, the message shown below will appear and
01-ROM Checksum of the SYSTEM test will be executed.
After selecting this test, the same subtests as 3.24 Running Test are executed successively.
For more details on the procedure and test content, refer to Running Test.
When the heatrun test ends, following message appears in the display.
************************************************
************************************************
Press any key to continue...
Press any key and return to the startup menu.
NOTE: The test result (Errorlog.txt) is stored in the floppy disk. The result is displayed
in the same format as Log Utilities. For more details of the format, refer to 3.23
Log Utilities.
PORTEGE S100 Maintenance Manual (960-508)
Downloaded from LpManual.com Manuals
SYSTEM TEST NAME
SUB-TEST
: XX
PASS COUNT : XXXXX
WRITE DATA : XX
ADDRESS
: XXXXXX STATUS
HEATRUN TEST END
XXXXXX
xxxxxxx DIAGNOSTIC TEST VX.XX
[Ctrl]+[Break] ; test end
[Ctrl]+[C]
ERROR COUNT: XXXXX
READ DATA
: XX
: XXX
3 Tests and Diagnostics
; key stop
3-21

Advertisement

Table of Contents
loading

Table of Contents