H/W (Hardware) Initial Information Setting Tool; Heatrun Test Program - Toshiba Portege R300 Maintenance Manual

Hide thumbs Also See for Portege R300:
Table of Contents

Advertisement

3.1.2 H/W (Hardware) initial information setting tool

The H/W initial information setting tool consists of the following programs.
Initial configuration
DMI information save
DMI information recovery
System configuration display
E2PROM test (MAC/GUID/DMI) (T&D)
You will need the following equipment to perform some of the programs.
The Diagnostics Disk (Main T&D)

3.1.3 Heatrun test program

The heatrun test starts automatically after the selection.
You will need the following equipment to perform this program.
The Diagnostics Disk (Main T&D)
PORTEGE R300 Maintenance Manual (960-591)
3 Tests and Diagnostics
[CONFIDENTIAL]
3-3

Advertisement

Table of Contents
loading

Table of Contents