Unit Repair Overhaul; Generator; Dismounting And Remounting - Suzuki Grand Vitara XL-7 Service Manual

Hide thumbs Also See for Grand Vitara XL-7:
Table of Contents

Advertisement

6H-4 CHARGING SYSTEM
3) Using special tool (C), turn roller tensioner counterclockwise to
until special tool (B) becomes free. With roller tensioner kept in
that state, fix it by tightening roller tensioner bolt (1) to specified
torque.
Special tool
(B): 09919-56590/OUT0000142
(C): 09919-56620
Tightening torque
.
(a): 50 N
m (5.0 kg-m, 36.5 lb-ft)
4) Remove special tool (B) and (C), turn crankshaft pulley 4 revolu-
tions.
5) Using special tool (B), check that dynamic roller tensioner holes
are aligned. If they are not aligned, repeat step 3) to 5).

UNIT REPAIR OVERHAUL

GENERATOR

DISMOUNTING AND REMOUNTING

D Dismount in numerical order indicated in figure.
D For remounting, reverse dismounting procedure.
D Tighten bolt and nut to specified torque.
Tightening Torque
P/S pump mounting bolt: 25 N
.
m (2.5 kg-m, 18.0 lb-ft)
1. Degassing tank
2. Radiator inlet hose
3. Generator belt
4. P / S oil tank
5. P / S pump
6. Terminal "B" and "L" cables
7. Generator

Advertisement

Table of Contents
loading

Table of Contents