Ricoh B003 Service Manual page 76

Hide thumbs Also See for B003:
Table of Contents

Advertisement

TWO-TRAY FINISHER INSTALLATION
[A]
3. Install the left joint bracket [A] (! x2 M4x14) and right joint bracket [B] (! x2
M4x14).
4. Attach the ground plate [C] (! x2 M3x6) to the center of the paper tray.
5. Open the front door of the finisher, and pull out the locking lever [D] (! x1).
6. Push the finisher to the side of the machine with the holes in the finisher
aligned with the joint brackets, and then dock the finisher against the machine.
7. Push in the locking lever and secure it (! x1), then close the front door.
B003/B004/B006/B007
CÓPIA NÃO CONTROLADA
B352I104.WMF
[C]
1-38
CÓPIA NÃO CONTROLADA
[B]
[D]
B352I105.WMF
SM

Advertisement

Table of Contents
loading

This manual is also suitable for:

B004B006B007

Table of Contents