1.2 INSTALLATION FLOW CHART
The following flow chart shows how to install the optional units more efficiently.
Does the user require the Paper Tray Unit, LCT, or Finisher?
Place Copier on the paper tray unit
Install the paper tray unit
Bridge Unit:
Paper Tray Unit:
Other requirements:
SM
CÓPIA NÃO CONTROLADA
Unpack Copier
Y e s
Install the copier
Install the bridge unit (if required)
If the customer requires the 1-bin tray:
Remove the scanner unit
Install the 1-bin tray
Replace the scanner unit
Install the remaining options in any order
Needed for the finishers and external output tray.
Needed for LCT and finishers.
See Overall Machine Information – Installation Option
Table.
1-5
CÓPIA NÃO CONTROLADA
INSTALLATION FLOW CHART
N o
B004I510.WMF