Reconnecting The Ups - Powerware Prestige 6000 Installation And Operator's Manual

Prestige series
Hide thumbs Also See for Prestige 6000:
Table of Contents

Advertisement

Reconnecting the UPS

Use the following procedure to reinstall the PPU and transfer the critical
load from Maintenance Bypass (AC Line operation) to the PPU:
Powerware
®
Prestige Series Installation and Operator's Manual for IBM Applications (6000 VA) Uncontrolled Copy
1. Reconnect the battery cabinet to the battery connector on the
PPU rear panel.
2. Switch the circuit breaker on all battery cabinets to the ON (
position.
3. Confirm the correct UPS output voltage is selected according to
the PPDM model:
PPDM Model Number
L6-30R/IEC 320-C19 208: 120/208
L6-30R/5-15R 208: 120/208
IEC 309/IEC 320-C13 240: 240
L6-30R/5-15R 240: 240
*
The UPS output voltage should be set according to local mains voltage.
Using a screwdriver, turn the switch to the corresponding
position of the output voltage required (see Figure 20). The
output voltage is factory-set to 220V.
Do not turn the Voltage Selector switch while the UPS is operating (see "Changing the
Output Voltage" on page 49). Changing the output voltage while the UPS is operating
may cause an emergency power-off.
UPS Voltage Selector Switch Position*
Set to 220V for 220V PPDM output
Set to 230V for 230V PPDM output
Set to 240V for 240V PPDM output
Set to 200V for 100/200V PPDM output
Set to 220V for 110/220V PPDM output
Set to 230V for 115/230V PPDM output
Set to 240V for 120/240V PPDM output
C A U T I O N
UPS Operation
)
|
208
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents