Getting Started; Installing The Ups; Creating An Installation Plan; Preparing Your Site - Powerware 9330 Installation & Operation Manual

Ibm 9910 ups 20 kva
Table of Contents

Advertisement

n

Getting Started

Installing the UPS

1.1
The each cabinet of the UPS system is shipped on a separate pallet. Use a forklift
or pallet jack rated to handle the weight of the cabinets (refer to Drawing
164201491---3 in Appendix A for cabinet weights), to move the packaged cabinet
sections to the installation site, or as close as possible to the site, before unloading
from the pallet.
This is the basic sequence of the installation steps:
1.
Create an installation plan for the UPS system (Chapter 1).
2.
Prepare your site for the UPS system (Chapter 1).
3.
Inspect, unpack, and unload the UPS cabinet sections (Chapter 1).
4.
Wire the system (Chapter 2).
5.
Install features, accessories, and/or options, as applicable (Chapter 3).
6.
Complete the Installation Checklist (Chapter 2).
7.
Have authorized service personnel perform preliminary operational checks and
startup.
NOTE: Startup and operational checks should be performed only by authorized
service personnel. This service is usually offered as part of the sales
contract for your UPS. Contact service in advance (usually a two week
notice is required) to reserve a preferred startup date.
1.1.1

Creating an Installation Plan

Before beginning to install the UPS system, read and understand how this manual
applies to the system being installed. Use the procedures and illustrations in the
following chapters to create a logical plan for installing the system.
1.1.2

Preparing Your Site

For your UPS system to operate at peak efficiency, your installation site should
meet the environmental parameters outlined in this manual. If you intend to
operate the system at an altitude higher than 1500 meters (5000 feet), contact your
local sales or service office for important information about high altitude operation.
The operating environment must meet the weight, airflow, size and clearance,
requirements specified in Appendix A.
Powerware 9330 (IBM 9910 20 kVA) Installation and Operation
164201491 REV. B 013004
1
1--1

Advertisement

Table of Contents
loading

Table of Contents