Installation
40
Powerware
8. Switch the circuit breaker to the ON (
on page 36) on each battery cabinet connected to the PPU.
Each battery cabinet performs a self-test and then enters normal
operation. The battery cabinet startup should take about three
seconds.
9. Verify that the circuit protectors for output receptacles are in
the ON position (pushed in).
10. Switch the PPU input breaker to the ON (
Figure 9 on page 36).
11. Switch the PPDM input breaker to the ON (
not apply to the IEC 309 PPDM).
The UPS performs diagnostic tests and enters Normal mode
with the equipment (load) offline. The
lit. The startup should take about 15 seconds.
12. Press and hold the Output On button until you hear the UPS
beep (approximately one second).

The
indicator remains lit and the Self Test indicator turns
on. The front panel displays the percentage of full load being
applied to the UPS. The UPS is now in Normal mode with the
load online. See "Normal Mode" on page 46 for more
information.
13. If you connected a REPO switch to the UPS, test the switch
while the UPS is operating to ensure proper operation.
Press the REPO switch. The UPS shuts down and stops
providing power to the equipment. To restart the UPS, follow
the startup procedure beginning on page 39.
NOTE If the REPO test fails and the UPS does not shutdown, contact your service
representative.
®
Prestige Series Installation and Operator's Manual for IBM Applications (6000 VA) Uncontrolled Copy
) position (see Figure 9
|
) position (see
|
) position (does
|

indicator remains

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents