Toshiba PORTEGE M300 Maintenance Manual page 289

Hide thumbs Also See for PORTEGE M300:
Table of Contents

Advertisement

4 Replacement Procedures
Installing the LCD unit /FL Inverter
To install the LCD unit/FL inverter, follow the steps below and refer to figure 4-42, 4-43.
1. Secure the GND cable and washer to the LCD unit with the following screw.
M1.4x2.0S
NOTE: Be sure to secure the GND cable with the caulking side outward.
2. Connect the LCD harness to the connector on the back of LCD unit and stick the
copper tape over the connector.
NOTE: (1) Stick the copper tape by fitting its edge to the corner of LCD unit connector.
(2) Make sure that there is no floating and coming-off of copper tape and that
the copper tape is stuck over the LCD unit connector, harness connector and
LCD harness.
LCD unit connector
Fitting the edge to the
corner of connector
3. Place the LCD unit along the guide of LCD cover.
4. Secure the GND cable with the following screw.
M2.0x4.0B
NOTE: Be sure to secure the GND cable with the caulking side upward.
PORTEGE M300 Maintenance Manual (960-504)
S-THIN FLAT BIND screw
Harness connector
FLAT BIND screw
4.27 LCD unit/ FL inverter
×1
LCD harness
Copper tape
×1
4-61

Advertisement

Table of Contents
loading

Table of Contents