REMOTE RECEIVER INSTALLATION

1) Install the heat shield to the receiver with two screws.
2) Attach to the floor of the unit with a velcro pad. Locate the
receiver at the far right hand side of unit as shown below.
3) See Remote Control installation instructions for information on
coding the handheld transmitter to the receiver
GAS PIPE
PRESSURE TESTING
The appliance must be isolated from the gas supply
piping system by closing its individual manual shut-
off valve during any pressure testing of the gas
supply piping system at test pressures equal to or
less than 1/2 psig. (3.45 kPa). Disconnect piping
from valve at pressures over 1/2 psig.
The manifold pressure is controlled by a regulator
built into the gas control, and should be checked
at the pressure test point.
NOTE: To properly check gas pressure, both
inlet and manifold pressures should be
checked using the valve pressure ports
on the valve.
1) Make sure the valve is in the "OFF" position.
2) Loosen the "IN" and/or "OUT" pressure tap(s),
turning counterclockwise with a 1/8" wide flat
screwdriver.
3) Attach manometer to "IN" and/or "OUT"
pressure tap(s) using a 5/16" ID hose.
4) Light the pilot and turn the valve to "ON" position.
5) The pressure check should be carried out with
the unit burning and the setting should be within
the limits specified on the safety label.
6) When finished reading manometer, turn off the
gas valve, disconnect the hose and tighten the
screw (clockwise) with a 1/8" flat screwdriver.
Note: Screw should be snug, but do not
over tighten.
16 |
E33-10 FPI Direct Vent Gas Insert

SIT 829 VALVE DESCRIPTION

1) Gas on/off knob
2) Electronically Operated Hi/Lo
3) Pilot Adjustment
4) Thermocouple Connection - option
5) Outlet Pressure Tap
6) Inlet Pressure Tap
7) Pilot Outlet
8) Main Gas Outlet
9) Alternative TC Connection Point
DC SPARK IGNITER BATTERY
INSTALLATION
Install the supplied battery into the DC Sparker Box
by opening the battery compartment.
NOTE: The battery in the DC Sparker Box will
need to be replaced annually.
OPTIONAL
BRICK PANEL
Optional Brick Panel Set:
Part #
Description
Top (brick) panel
Back (brick) panel
Left (brick) panel
Right (brick)panel
340-043 Top bracket
340-094 Bottom clips
511-031 Brick clips
Qty
1
1
1
1
1
2
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Energy e33-lp10

Table of Contents