1.6 System Installation Procedure

The system installation procedure is as follows:
1) Open the cabinet.
2) Ground the ground lug in the basic cabinet (or use third prong AC around)
3) Insert the daughter boards.
4) Insert the daughter boards into the universal slots (slot 2, 3 and/or 4).
5) Install the cabinet on a wall, if necessary, depending on the installation environment
6) Connect and tie the cables with the cable ties.
7) Connect the AC 110~120 V input power. If necessary, connect Uninterruptible Power
Supply (UPS).
8) Turn on the system. Wait 3.5 to 4 minutes to complete boot up.
Table 1.5 Parts on the right panel of the cabinet
Function
Trunk ports
Ports that connect the base cabinet with the expansion cabinet (NOT USED IN
USA)
Station ports for subscribers (i.e analog phone, digital phone, LAN)
Button for resetting the system
Station ports for analog phones
Ports that connect external audio devices, paging device, loud bell, common
bell, or external relays
LAN port