OfficeServ 7030
TECHNICAL MANUAL
PART1. Before Installing
This part describes the checklists (installation site, grounding & power conditions etc.) which
should be inspected before installing the OfficeServ 7030 system. This chapter also describes
the items included in the OfficeServ 7030 package and the installation procedure.
1.1 Site Information
Select a site that satisfies the following safety, temperature and humidity conditions.
1.1.1 Safety Conditions
OfficeServ 7030 system should not be installed near materials that can cause fire, such as
explosive gas and inflammable objects.
OfficeServ 7030 system should not be installed near equipments that generate
electromagnetic waves, such as monitors or copying machines.
The installation location should be easily accessible for trunk line and extension line
deployment, for power and grounding wire connection, and for maintenance and repair.
OfficeServ 7030 system should not be installed in populated aisles/passageways or in
areas used for moving equipment.
Keep the area clean. Prevent the dust from damaging the cabinet's board-connecting
part.
Before installing the OfficeServ 7030 system, check items such as the electric wiring
status, grounding status, voltage and frequency.
1.1.2 Temperature and Humidity Conditions
The temperature and humidity conditions are as follows:
− Operation Temperature: 0~40°C (32 ~ 104°F)
− Storage temperature: -10~50°C (50 ~ 122°F)
− Humidity: 10~90%
Cool area protected from direct sunlight.
Ventilators should be installed to remove dust.
1.1
Home Page
INSTALLATION
PART 1 MAY 2010