Unpacking The Enterprise 6500/5500 Cabinet Systems - Sun Microsystems 6500 Installation Manual

Hide thumbs Also See for 6500:
Table of Contents

Advertisement

The tasks for installing the systems are:
Unpacking the cabinet server on page 1-2
Preparing the servers on page 1-6
Preparing the site on page 1-9
Cabling on page 2-1
Powering on on page 3-1
Using the softwareon page 4-1
Note – For information about physical specifications, electrical specifications, and
environmental requirements, refer to Appendix A, "Specifications," in the Sun
Enterprise 6500/5500/4500 Systems Manual.
1.1
Unpacking the Enterprise 6500/5500
Cabinet Systems
Note – Inspect all shipping cartons for evidence of physical damage. If a shipping
carton is damaged, request that the carrier's agent be present when the carton is
opened. Keep all contents and packing material for the agent's inspection.
If you have a standalone Enterprise 4500 system, or the cabinet is already unpacked,
go to Section 1.2 "Preparing the Electrical Circuits."
Note – Any unpacking instructions printed on the outside of the shipping carton
take precedence over instructions in this section.
Caution – If your cabinet system is on a wooden pallet, extend the cabinet levelling
pads so that the cabinet cannot roll. If the original shipping pallet has side rails, it is
not necessary to lower the levelling pads.
1. Cut the plastic or metal straps that are around the shipping container and lift off
the corrugated top.
Store the shipping materials for future shipments.
2. Remove the sides of the container.
The container is held together by six plastic clips. To unlock a clip, press the two
inner tabs together and pull out the entire clip.
1-2
Sun Enterprise 6500/5500/4500 Systems Installation Guide • August 2001

Advertisement

Table of Contents
loading

This manual is also suitable for:

55004500

Table of Contents