Before Operation (Main Unit) - Sanyo SAP-KRV91EH Technical & Service Manual

Inverter split system air conditioner
Hide thumbs Also See for SAP-KRV91EH:
Table of Contents

Advertisement

Before Operation
Air intake grill
Air conditioner
mounting
location selector
DEMO.
TEST
Operation
ON
selector
OFF
Power
switch
Air Conditioner Mounting
Location Selector
14

Before Operation (Main Unit)

Make the following preparations before operating the air conditioner.
1. Open the air intake grill.
To access the inner main operation panel, grip both ends of the air intake
grill and pull towards you so that the grill comes off.
2. Set the Operation selector to the ON position.
Normally, the selector should be set to the ON position. The OFF, TEST
RUN, and DEMO. positions are used for inspection and other purposes.
When set to TEST RUN, the display indicator flashes.
3. Plug the air conditioner into the outlet.
4. Press the Power switch to set it to ON.
Off
On
5. Set the Air Conditioner Mounting Location selector to the installation
location for the room.
Setting the air conditioner mounting location for the room sets the
airflow range to positions suitable for the installation location. The
swing ranges of the horizontal airflow control flaps for each setting are
shown below.
LEFT
Emphasis on
right-side space
RIGHT
CENTER
Emphasis on
Emphasis on
center space
left-side space
OI-275-14EG

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sap-crv91eh

Table of Contents