Part 8 Trial Operation And Field Settings - Daikin FTXN25KEV1B Service Manual

Inverter pair wall mounted type k-series
Hide thumbs Also See for FTXN25KEV1B:
Table of Contents

Advertisement

1. Pump Down Operation........................................................................137
2. Forced Cooling Operation ...................................................................138
3. Trial Operation ....................................................................................139
4. Field Settings ......................................................................................140
136
Trial Operation and
4.1 When 2 Units are Installed in 1 Room..................................................140
4.2 Jumper Settings ...................................................................................140
a Diode Bridge ....................................................................................141
Field Settings
Trial Operation and Field Settings
SiBE041102_A
Part 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxn35kev1bRxn35kev1bRxn25kev1b

Table of Contents