Pump Down Operation - Daikin FTXN25KEV1B Service Manual

Inverter pair wall mounted type k-series
Hide thumbs Also See for FTXN25KEV1B:
Table of Contents

Advertisement

SiBE041102_A

1. Pump Down Operation

Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 to 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 to 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 138 for forced cooling operation.
Trial Operation and Field Settings
Liquid stop valve
Gas stop valve
Service port

Pump Down Operation

Hexagonal
wrench
Close
Valve cap
(R13628)
137

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftxn35kev1bRxn35kev1bRxn25kev1b

Table of Contents